Completed Projects

Completed Projects

Completed Projects

Tadbir Alborz Co Project

Owner: Tadbir Alborz Company

Project description:

The company utilizes its expertise technical knowledge and capabilities using the devices and advanced machinery can produce a variety of industrial bags (Jumbo bags and polypropylene bags) as well as the production of pallets for packing goods tailored to customers' requirements.

Scope of Work: MC Services

Completion date: 2022

Project Location: km 75 of Tehran-Saveh Highway

Completed Projects

Marun Petrochemical Project

Owner: Marun Petrochemical Company

Project description:

Operationalization of the Marun Petrochemical plant with a production capacity of 1.1 million tons of polyethene per year, setting us among the largest olefin producers, made it possible to convert C2+ (ethane), extracted from natural gas, into polymeric and chemical products through olefinic processes.

Scope of Work: Feasibility study of Gas pipeline

Completion date: 2021

Project Location: Special Economic Zone

Completed Projects

Karoon Phosphate Products Complex

Owner: Karoon Phosphate Products Complex Company

Project description: Karoon Phosphate Products Complex (KPPC) is One of the major producers of phosphoric acid in Iran with a capacity of 150,000 TPY (Diluted PA) and the only producer of Sodium tripolyphosphate in the Middle East with a capacity of 50,000 TPY Abadan. Production and supply of sodium tripolyphosphate in compliance with quality and environmental standards.

Scope of Work: MC Services in STPP Plant

Completion date: 2014

Project Location: Abadan

Completed Projects

Liya Glass Project

Owner: Liya Glass Company

Project description:

Liya Glass began operations in 2001 to significantly expand manufacturing capabilities and cater to the growing demand for high-quality float glass in Iran. Liya Glass is now a leading float glass producer, supplying the construction, automotive, mirror, and decorative glass industries.

Scope of Work: Feasibility Study – Production of 40,000 TPY of Nano Glass

Completion date: 2023

Project Location: Qazvin

Ongoing Projects

Ongoing Projects

Ongoing Projects

HIRSA POLYMER SAHAND PETROCHEMICAL PROJECT

Owner: HPS Company

Project description: PDH (Propane hydration) and PP (polypropylene) with a production capacity of 200,000 tons annually.

Scope of Work: MC Services

Expected Completion date: 2027